This project involved civil construction for a private container yard operator in Port Sudan. The scope was the execution of a long stone retaining wall to define the boundary of an industrial drain channel.
Project Objectives
The client required a durable, long-term boundary solution to stabilize the area around a drain channel. The wall needed to be constructed from stone masonry while integrating reinforced concrete elements for maximum stability.
Key Features
Construction: Executed a 250-meter stone retaining wall.
Methodology: Included excavation, foundation preparation, stone masonry construction, and casting of reinforced concrete elements.
Result: Delivered in 2025, the wall provides a robust, engineered boundary, enhancing drainage control and structural integrity for the container yard.