Project Overview
Trantic Engineering was engaged as a sub-contractor for the Acommas Group to execute crucial civil works at the MTN Switch Center in Port Sudan.
Project Objectives
The main objective was to construct highly durable concrete foundations that could withstand heavy equipment loads and strictly adhere to industrial civil standards and precise contractor specifications.
Key Features
Foundation Construction: Delivered all civil works, including site preparation, excavation, formwork, reinforcement, and concrete casting.
Compliance & Delivery: Successfully completed the project in 2025, ensuring all foundations met stringent load requirements and industry standards.
Support: Provided the necessary structural base for the reliable operation of critical facility safety infrastructure.