Firefighting System Foundation Works (MTN Sudan)

Project Overview

Trantic Engineering was engaged as a sub-contractor for the Acommas Group to execute crucial civil works at the MTN Switch Center in Port Sudan.

Project Objectives

The main objective was to construct highly durable concrete foundations that could withstand heavy equipment loads and strictly adhere to industrial civil standards and precise contractor specifications.

Key Features

Foundation Construction: Delivered all civil works, including site preparation, excavation, formwork, reinforcement, and concrete casting.
Compliance & Delivery: Successfully completed the project in 2025, ensuring all foundations met stringent load requirements and industry standards.
Support: Provided the necessary structural base for the reliable operation of critical facility safety infrastructure.